ND SatCom

Integration / Implementation

The ND SatCom Integration Team specializes in final component assembly into the system. The basis for assembly is the build documentation resulting from the Critical Design Phase, which gets approved and released within the CDR (Critical Design Review).

In the first step the mechanical part of the system assembly takes place, followed by the system cabling - from electrical power to signal cabling.

Contact us

Get advice on ND SatCom products, solutions and services.